Sandy Hook Housing Rehabilitation Gateway National Recreate Area GATE |
Building: |
|
Estimate by: |
|
Description |
Total Estimated Cost |
FOUNDATIONS:
Grading, excavation and consolidation at foundation subsidencels
Repoint foundation
Perimeter drain system
Sump pump and drainage system |
|
SUPERSTRUCTURE:
Miscellaneous structural repairs |
|
EXTERIOR ENCLOSURE:
R-19 insulation at exterior walls, blown in
Miscellaneous exterior trim repairs
Exterior siding replacement - in kind (24 missing shingles)
Repair / replace where beyond repair approximately 6/6 WD DH
Remove plywood and install 1 6/6 WD DH sash to match original
Repair / replace 1/1 porch windows
Stairs wood frame construction
Remove rear vinyl door; install new appropriate wood door
Install flood vents in former basement window openings
Exterior painting |
|
ROOFING:
Remove and replace existing roof, asphalt shingles, 50 year
Gutter, leaders and flashing
New R50 blown insulation at roof |
|
INTERIOR CONSTRUCTION:
Reframe existing layout to accommodate new mech & elec rooms
Drywall/plaster, patching & replacement at damaged wall areas
Replace door interior door hardware, passage locks, res grade 3
Specialties towel bars, dispensers, mirrors, etc. |
|
STAIRS:
Structural & aesthetic repairs
Stair tread replacement |
|
INTERIOR FINISHES:
Refinish existing wood floors
Resilient flooring kitchens, bathrooms, utility rooms, mech, elec rooms
Painting walls, ceilings, doors |
|
PLUMBING (Based on central kitchen & central restroom):
Sanitary piping distribution, PVC including floor drains & vents
Domestic piping distribution, copper
Kitchen sinks, w/ trim, countertop, SS, 43”x 22”, dbl bowl
Lavatory w/trim, vanity top, 18” round
Toilets, vitreous china, two piece tank, floor mounted
Shower stall, fiberglass, 1 pc, 3 walls, 36” square |
|
HVAC:
Hot water boiler, cast iron, gas fired, 244MBH
Heating boiler, cast iron, gas fired, 585MBH
Rehabilitate existing cast iron steam radiators
Copper pipe water distribution
Propane tank for boilers, 500 gal |
|
FIRE PROTECTION:
NFPA 13R, CPVC, schedule 40, fire sprinkler system |
|
ELECTRICAL:
Service, panels, and Distribution
Lighting and Branch wiring, Romex
Equipment connections
Light fixtures, plates, finish out
Fire detection and alarm system
Electrical secondary |
|
EQUIPMENT:
Refrigerator
Stove with cooktop
Dishwasher
Microwave
Washer & Dryer set |
|
FURNISHINGS:
Kitchen lower cabinets, oak boxes, plastic laminate counters
Kitchen upper cabinets, oak boxes
Restroom countertops, laminate
ADA bathroom stalls, baked enamel finish, floor mounted
Bathroom stalls, baked enamel finish, floor mounted |
|
SPECIAL CONSTRUCTION: |
|
SELECTIVE BUILDING DEMOLITION:
Hazardous material removals
Hot water boiler system removal
Oil boiler heat system removal
Above ground fuel oil aboveground 500 gal storage tank removal
Electrical gear & panel removals
Miscellaneous internal removals water damage materials |
|
SITE RESTORATION (Existing site):
Backfill basement with sand
Revegetation of existing site with hydro seed |
|
SITE IMPROVEMENTS:
Landscaping |
|
SITE MECHANICAL UTILITIES:
Remove lines and cap existing utilities as required
Sanitary 4” lateral
Fire line, 2” lateral 1” domestic tee
Storm tie in from perimeter and crawl space line to surface drainage
Electrical secondary
Sanitary street tap
Domestic street tap |
|
SUBTOTAL DIRECT CONSTRUCTION COSTS:
Published Location Factor
Remoteness Factor
Federal Wage Rate Factor
State & Local Taxes (Calculated on Materials Only)
Design Contingency |
|
TOTAL DIRECT CONSTRUCTION COSTS:
Testing & Inspections
Standard General Conditions
Government General Conditions
Historic Preservation Factor |
|
SUBTOTAL NET CONSTRUCTION COST:
Design Liability
General Liability
Contractor Overhead
Contractor Profit |
|
ESTIMATED NET CONSTRUCTION COSTS:
Contracting Method Adjustment (8A Negotiated)
Permitting
Bonding
Inflation Escalation (12 Months) |
|
TOTAL ESTIMATED NET COST OF CONSTRUCTION:
Design
Project Management
NPS Management (Covered under Sandy Program)
Construction Contingency |
|
TOTAL ESTIMATED GROSS COST OF CONSTRUCTION: |
|
Please email any and all attachments separately to Gateway_BMD@nps.gov. Applicants may also submit supporting documents by mail to:
Superintendent
Gateway National Recreation Area
210 New York Avenue
Staten Island, New York 10305
SUBMISSION - Fort Hancock RFP
Please refer to the RFP for additional information and instructions. |
|